Energy &
Infrastructure

Power, Copper & Data Centers — The Foundation of AI

agent37.club

Where We Are in the Stack

Layer 5: Applicationsagents, tools, MCP
Layer 4: Modelstraining, inference, attention
Layer 3: Hyperscalersdata centers, networking
Layer 2: ChipsGPUs, HBM, fabs
Layer 1: Energy ← YOU ARE HEREpower, copper, materials

The absolute foundation. Without energy, nothing above exists.

“You can design the most brilliant chip in the world. If you can’t power it, it doesn’t exist.”

Power is the binding constraint on AI scaling. Not talent, not algorithms, not capital — electricity.

Data Center Power Demand

96 GW

projected global DC power by 2026
(up from 49 GW in 2023)

  • AI alone: ~40 GW by 2026 (40%+ of all DC power)
  • 5 individual facilities on track to hit 1 GW each in 2026
  • Stargate project alone: ~7 GW planned, targeting 10 GW total

Scale Check

A single GB200 NVL72 rack draws ~120 kW. A data center with 10,000 such racks needs 1.2 GW — the output of a large nuclear plant.

This is just one facility for one company.

The Hyperscaler Capex Race

2025 planned capital expenditure

Amazon
~$125B
Google
$91–93B
Microsoft
~$80B
Meta
~$72B
$380B+

top 4 hyperscaler capex in 2025. Projected $602B across top 5 in 2026.

Data Center Economics

The business of housing compute

MetricValue
Build cost per MW (IT capacity)$10–15 million
PUE (Power Usage Effectiveness)Best: 1.1 / Typical: 1.3–1.5
Design life15–20 years
Time to build (greenfield)18–36 months
Staff per 100 MW facility~50–100

What is PUE?

Total facility power ÷ IT equipment power. PUE of 1.3 means 30% overhead for cooling, lighting, networking. Google claims PUE of 1.1. AI racks are pushing PUE higher because of cooling demands.

Where the Money Goes

Cost breakdown per MW of AI data center

Servers/GPUs
60–70%
Power Infra
15–20%
Cooling
5–10%
Building/Land
5–10%

GPUs dominate upfront cost. But over 15 years, electricity becomes 30–40% of total cost of ownership. That’s why power pricing matters so much.

Electricity Pricing by Region

Where you build determines your operating cost forever

Region$/kWh100 MW Annual CostNotes
Nordic countries$0.03–0.05$26–44MHydro, cool climate
Quebec~$0.04~$35MCheap hydro
US (avg)$0.08–0.12$70–105MVaries wildly by state
Northern Virginia$0.07–0.09$61–79MFiber hub, but grid maxed
Singapore$0.15+$131M+Land + power constrained

A 2x difference in electricity price = $40M+/year difference for a single 100 MW facility. Over 15 years, that’s $600M.

The Nuclear Renaissance

AI companies are going nuclear — literally

  • Microsoft: Three Mile Island Unit 1 restart (835 MW), $16B 20-year PPA with Constellation
  • Google: Kairos Power SMR fleet (500 MW) + Duane Arnold restart (601 MW) via NextEra
  • Amazon: $20B+ Susquehanna nuclear campus (1.9 GW), Talen Energy deal
  • Meta: 1.1 GW PPA with Constellation (Clinton Clean Energy Center)

Big tech signed 10 GW+ of new US nuclear capacity in the past year.

Why Nuclear?

  • 24/7 baseload — no intermittency
  • Zero carbon — meets ESG goals
  • 90%+ capacity factor — most reliable source
  • Decades of stable pricing — fuel is cheap
  • Small footprint — dense energy per acre

Power Generation Options

SourceCapacity Factor$/MWhCarbonAI Suitability
Natural Gas60–80%$40–60MediumGood — dispatchable
Solar25–30%$30–50ZeroIntermittent — needs storage
Wind30–45%$30–60ZeroIntermittent — needs storage
Nuclear90%+$60–90ZeroBest for baseload
Geothermal90%+$40–80Near-zeroExcellent — limited locations

AI workloads run 24/7. Solar and wind alone can’t do this without massive battery storage. Nuclear and gas provide the baseload reliability AI data centers need.

Water: The Hidden Cost

~1.8 L

of water per kWh for evaporative cooling

  • Google hyperscale DC: ~550K gallons/day each
  • Google total (2023): 5+ billion gallons
  • US total indirect water (2023): 211 billion gallons
  • Texas DCs: 49B gal (2025) → 399B gal by 2030

Drought Risk

Arizona, Texas, Nevada — popular data center locations that are water-stressed. Some municipalities are already pushing back on new data center permits.

Liquid cooling (direct-to-chip) reduces water use by 80%+ but increases capex and complexity.

The Cooling Transition

Air cooling is hitting a wall

WorkloadPower/RackCooling
Traditional server5–10 kWAir
GPU (A100 era)20–30 kWAir (pushed)
GPU (H100 era)40–60 kWAir + rear-door
GB200 NVL72120–140 kWLiquid required

Liquid Cooling

Direct-to-chip: cold plates on GPU/CPU, water loops. Most practical upgrade.

Immersion: entire server submerged in dielectric fluid. Best thermal performance but requires complete redesign.

Liquid-cooled racks: 46% of market in 2024, projected 50–76% by end 2026. No longer optional.

Copper: The Other Bottleneck

Data centers are copper-intensive:

  • Power cables and busbars
  • Transformers and switchgear
  • Networking cables
  • Cooling system piping
  • ~27 tonnes of copper per MW (Microsoft benchmark)
  • AI campuses: up to 50,000 tonnes per site

DCs projected to consume 1.1M tonnes/year by 2030 (~3% of global demand). Copper prices +35% in 2025, above $11,000/tonne.

Competing Demand

Data centers are fighting EVs and grid electrification for the same copper. An EV uses 4x the copper of an ICE vehicle.

New copper mines take 10–15 years from discovery to production. Supply can’t respond quickly. Prices at all-time highs.

Networking at Scale

Connecting thousands of GPUs is its own engineering challenge

TechnologyBandwidthUse CaseKey Player
NVLink900 GB/sGPU-to-GPU (within node)NVIDIA
InfiniBand400 Gb/sGPU-to-GPU (across nodes)NVIDIA (Mellanox)
Ethernet (800G)800 Gb/sGeneral + AI trainingBroadcom, Arista
NVSwitchN/A (fabric)All-to-all GPU connectivityNVIDIA

A 100,000 GPU training cluster needs ~$1B in networking alone. InfiniBand has lower latency but creates NVIDIA lock-in. Ethernet is catching up.

Geographic Constraints

Where can you actually build?

Requirements

  • Cheap, abundant power
  • Water access (for cooling)
  • Fiber connectivity
  • Permitting friendliness
  • Low natural disaster risk
  • Skilled labor availability

Hot Spots

  • N. Virginia: DCs consumed 25% of state electricity (2025), projected 46% by 2030
  • Texas: cheap power, land, but heat + water issues
  • Nordic countries: cheapest power, natural cooling
  • Ohio/Midwest: new buildout zone, available power
  • Middle East: cheap energy, sovereign fund $$$

The Grid Problem

5–7 years

average wait time for new grid interconnection in many US regions

  • The US power grid was built for the 20th century
  • Transmission lines take years to permit and build
  • Some utilities refusing new connections
  • Dominion Energy: in talks for 47 GW additional demand (~2x its peak load)

The Real Bottleneck

It’s not just generation — it’s transmission. You can build a solar farm or a nuclear plant, but getting the power to the data center requires grid infrastructure that doesn’t exist yet.

This is why companies are exploring on-site generation (natural gas turbines, SMRs, fuel cells).

Rare Earths & Materials

The elements that make the machines work

MaterialUsed ForSupply Concentration
NeodymiumMagnets in generators, fans, drivesChina: ~60% mining, ~90% processing
LithiumBackup batteries (UPS systems)Australia, Chile, China
SiliconSemiconductor wafers, fiber opticsChina: ~70% polysilicon
GermaniumFiber optics, infrared sensorsChina: ~60%
CopperPower, cables, cooling, networkingChile, Peru, Congo

China controls processing for most critical materials. In 2023, China restricted gallium and germanium exports. Material access is a geopolitical weapon.

The Full Cost Stack

From electrons to inference — where the money goes over 15 years

Electricity
30–40%
GPUs/Servers
25–35%
Networking
10–15%
Cooling
8–12%
Building/Land
5–8%
Staff/Ops
3–5%

Upfront, GPUs dominate. Over the full lifecycle, electricity is the #1 cost. This is why every hyperscaler is obsessed with power contracts.

Investment Lens

Infrastructure is the picks-and-shovels of AI

SectorCompaniesThesis
Power UtilitiesNextEra, Vistra, Southern CompanyGrowing power demand = growing revenue
NuclearConstellation, Cameco, NuScaleAI driving nuclear renaissance
Copper MinersFreeport-McMoRan, Southern CopperStructural supply deficit
CoolingVertiv, Modine, nVentLiquid cooling transition
NetworkingArista Networks, Broadcom$1B+ networking per 100K GPU cluster

Vertiv stock: up ~8x since 2023. Vistra: up ~5x. Constellation: surging on nuclear PPAs. The market is waking up to the infrastructure layer.

“Every token you generate started as an electron.
Power is the foundation.
The energy layer decides the ceiling
for everything above.”