“We have more compute than we know what to do with. What we don’t have is enough bandwidth to feed it.”
  • An H100 can perform 989 trillion operations per second (BF16)
  • But its memory can only deliver 3.35 TB/s of data
  • To saturate compute, you need ~295 bytes per operation — LLM inference provides ~1

The GPU utilization crisis

During single-request LLM inference, GPUs are typically less than 1% utilized on compute. The tensor cores sit idle, starving for data. The bottleneck isn’t math — it’s moving bytes.

LLM Inference is Memory-Bound

The autoregressive decode loop

  • Each token generation reads the entire model’s weights from memory
  • A 70B parameter model in FP16: 140 GB read per token
  • But only ~140 billion multiply-adds per token
  • Arithmetic intensity: ~1 op per byte — far below what GPUs can consume

The key ratio

Arithmetic intensity = FLOPs ÷ Bytes transferred. When this is below the GPU’s ops:byte ratio, you’re memory-bound. For LLM decode at batch size 1, it’s always memory-bound.

// Generating one token from a 70B model

// 1. Read all weights from HBM
bytes_read = 70e9 * 2  // 140 GB (FP16)

// 2. Compute: one matmul per layer
flops = 2 * 70e9       // ~140 GFLOP

// 3. Arithmetic intensity
intensity = flops / bytes_read
// = 140 GFLOP / 140 GB
// = 1 FLOP/byte

// H100 needs 295 FLOP/byte to
// saturate compute.
// We're at 1. 295x under-utilized.

The Roofline Model

A visual framework for compute vs memory bottlenecks

  • X-axis: Operational intensity (FLOPs per byte)
  • Y-axis: Achievable performance (TFLOP/s)
  • Two ceilings: a diagonal memory bandwidth line and a horizontal compute line
  • The intersection is the ridge point — the intensity needed to fully use the GPU
GPUPeak TFLOP/sBW (TB/s)Ridge Point
A1003122.0156 ops/byte
H1009893.35295 ops/byte
B200~2,2508.0~281 ops/byte

LLM decode: deep in memory-bound territory

At batch size 1, LLM decode has arithmetic intensity of ~1. The ridge point for an H100 is 295. You’re operating at 0.3% of the way to compute saturation.

The takeaway

For LLM inference, buying a faster GPU doesn’t help much — you need more memory bandwidth. This is why HBM matters more than FLOPS for serving AI.

Prefill vs Decode — Two Different Worlds

Prefill (processing the prompt)

  • All input tokens processed in parallel
  • Large matrix multiplications — high arithmetic intensity
  • Almost entirely compute-bound
  • This is where tensor cores shine

Decode (generating tokens)

  • One token at a time, sequentially
  • Must read all model weights + KV cache per token
  • Tiny compute relative to data movement
  • Almost entirely memory-bound

Batch size matters: Increasing batch size improves arithmetic intensity for FFN layers — at batch 500+, FFN becomes compute-bound on an H100. But attention remains memory-bound at all practical batch sizes because the KV cache grows with the batch.

What is HBM?

Stacked DRAM dies, through-silicon vias, and the interposer

High Bandwidth Memory — The Concept

The problem with standard DRAM

  • DDR5 connects to the CPU/GPU via a narrow bus (64-bit per channel)
  • To increase bandwidth, you add more channels — but board space is limited
  • Result: DDR5 tops out around ~0.4 TB/s for a server

The HBM solution

  • Stack multiple DRAM dies vertically (8 or 12 layers)
  • Connect them with through-silicon vias (TSVs) — thousands of vertical wires
  • Use a 1024-bit wide bus (16× wider than DDR5)
  • Place the stack right next to the GPU on a silicon interposer
DRAM Die 8top
DRAM Die 7TSV ↓
DRAM Die 6TSV ↓
… Dies 3–5 …TSV ↓
DRAM Die 2TSV ↓
DRAM Die 1TSV ↓
Logic Base Diecontroller
Silicon Interposer← connects to GPU

Through-Silicon Vias (TSVs)

The vertical highways that make HBM possible

  • TSVs are vertical electrical connections that pass completely through a silicon die
  • Each HBM stack has thousands of TSVs connecting all DRAM layers
  • Manufacturing: etch deep trenches with DRIE, deposit insulating liner, fill with copper, polish flat
  • This enables the 1024-bit wide bus — impossible with traditional PCB traces

Why width matters

Bandwidth = bus width × clock speed. HBM’s 1024-bit bus is 16× wider than DDR5’s 64-bit channel. Even at lower clock speeds, HBM delivers far more bandwidth.

// Bandwidth comparison

// DDR5 (8 channels, server)
bw = 64 bits × 8 ch × 4800 MHz
   = 307 GB/s

// HBM3e (single stack)
bw = 1024 bits × 9.2 Gbps
   = 1,180 GB/s  // ~1.2 TB/s

// H200: 6 stacks of HBM3e
total = 6 × 1.2 TB/s
      = 4.8 TB/s

// B200: 8 stacks of HBM3e
total = 8 × 1.0 TB/s
      = 8.0 TB/s  // 26x DDR5!

Manufacturing HBM — 19 Extra Steps

Why HBM costs 5× more than standard DRAM per GB

Front-side processing (~10 steps)

  • Create frontside interconnect pillars
  • Etch TSV trenches using DRIE
  • Deposit insulating liners
  • Fill with copper, polish via CMP

Back-side processing (~9 steps)

  • Bond wafer to temporary carrier
  • Grind wafer to extreme thinness
  • Reveal TSVs from backside
  • Create backside interconnect pillars

Then: stack and package

  • Stack 8–12 paper-thin dies with micron precision
  • Bond with micro-bumps (20–30μm pitch)
  • Apply underfill (SK Hynix MR-MUF vs Samsung TC-NCF)
  • Mount on silicon interposer next to GPU die
  • Package the whole assembly (CoWoS)

The difficulty

Each HBM stack is under 1mm thin, contains thousands of microscopic TSV drill-holes, and must handle up to 15W of heat with no hotspots exceeding 85°C.

The Compound Yield Problem

  • Standard DRAM yields: 85–95%
  • HBM TSV process yield: ~95% per layer (best case)
  • But yields compound multiplicatively across stacked layers
Stack HeightPer-Layer YieldStack Yield
8-hi (HBM3e)95%66%
12-hi (HBM3e)95%54%
16-hi (HBM4)95%44%

Going from 8-hi to 12-hi drops yield by 15–20%. At 16 layers, nearly half of all stacks are defective.

Real-world HBM yields

Current HBM3e yields are estimated at 50–60% in production. Samsung famously failed multiple rounds of NVIDIA qualification testing for HBM3e, partly due to yield issues.

SK Hynix’s edge: MR-MUF

SK Hynix’s proprietary Mass Reflow Molded Underfill process has 3× more thermal bumps than Samsung/Micron’s TC-NCF approach, providing much better heat dissipation. This is a key reason for their market lead.

HBM Generations

From HBM2e to HBM4 — doubling bandwidth every generation

HBM Evolution

Generation BW / Stack Capacity / Stack Bus Width Key GPUs
HBM2e 460 GB/s 16 GB (8-hi) 1024-bit A100, MI250
HBM3 820 GB/s 24 GB (8-hi) 1024-bit H100
HBM3e 1.2 TB/s 36 GB (12-hi) 1024-bit H200, B200, MI300X
HBM4 2.0 TB/s 48 GB (8-hi) 2048-bit Vera Rubin, MI400

The trend: Each generation roughly doubles bandwidth. HBM4 also doubles the bus width from 1024 to 2048 bits — this is not a drop-in replacement. It requires entirely new interposer designs and memory controllers.

The HBM3e → HBM4 Leap

What changes with HBM4

  • 2048-bit bus — doubled. Requires new interposer design.
  • 2.0 TB/s per stack — NVIDIA pushing pin speeds to 11 Gbps
  • Up to 64 GB per stack (12-hi / 16-hi configurations)
  • Micro-bump pitch moves toward 10 μm (from 20–30 μm)

Timeline

  • Late 2025: Paid samples to NVIDIA from SK Hynix and Samsung
  • Mid-to-late 2026: Mass production begins
  • 2027: General market availability

NVIDIA Vera Rubin

288 GB HBM4 at 22 TB/s memory bandwidth. 8-hi stacks. NVL144 launching 2026; Rubin Ultra NVL576 in 2027.

AMD MI400

432 GB HBM4 at 19.6 TB/s. 12-hi stacks on CDNA 5. MI455X and MI430X shipping 2026.

Beyond HBM4 — Hybrid Bonding

  • HBM4 still uses micro-bumps for die-to-die connections (proven, cost-effective)
  • HBM4e / HBM5 will transition to hybrid bonding
  • Hybrid bonding: direct copper-to-copper contact, no bumps needed
  • Enables interconnect pitches below 10 μm with lower resistance and better thermals
  • SK Hynix plans hybrid bonding from HBM4e with 20-layer stacking

Hybrid bonding becomes “indispensable” for 20+ layer stacking — micro-bumps can’t scale that far without unacceptable yield loss and thermal issues.

2024–25 — HBM3e (8/12-hi) — micro-bumps
2026 — HBM4 (8/12/16-hi) — micro-bumps, 2048-bit bus
2027–28 — HBM4e (16/20-hi) — hybrid bonding begins
2029+ — HBM5 (20+ layers) — full hybrid bonding

The HBM Oligopoly

Three companies. One bottleneck. A $30B+ market.

Who Makes HBM?

Only three companies on Earth can manufacture HBM

SK Hynix
62% share
Micron
21%
Samsung
17%

HBM market share as of Q2 2025. Samsung’s share collapsed after failing NVIDIA’s HBM3e qualification repeatedly.

SK Hynix — the dominant force

FY2025: 97.15 trillion won revenue (~50% YoY growth). Operating profit: 47.21 trillion won. Overtook Samsung in annual profit for the first time ever.

Samsung’s struggle

Failed NVIDIA’s HBM3e qualification multiple times. Recently passed for 12-layer. Now racing to deliver HBM4 samples early to recover.

SK Hynix — From Commodity to AI Kingmaker

The financial transformation

MetricFY2025
Revenue97.15 trillion won
Operating profit47.21 trillion won
Net profit42.95 trillion won
Q4 revenue (record)32.83 trillion won
HBM % of DRAM revenue>40%
HBM revenue YoY growth2×

HBM4 positioning

  • Expected to supply ~70% of NVIDIA’s HBM4 for Vera Rubin
  • Signed supply agreements with OpenAI for Stargate supercomputer
  • Entire output sold out through 2026

The moat

SK Hynix’s MR-MUF packaging process provides a thermal advantage that Samsung and Micron haven’t matched. This is why they consistently win NVIDIA’s qualification tests.

The HBM Pricing Premium

Why HBM costs 5× more per GB than DDR5

HBM3e
~$15/GB
DDR5 Server
~$3/GB

Why the premium?

  • 3× wafer area per GB compared to DDR5
  • 19 extra manufacturing steps
  • 50–60% yields vs 85–95% for standard DRAM
  • Expensive CoWoS advanced packaging
  • Stringent NVIDIA qualification testing
  • Severe supply-demand imbalance

Price trajectory

HBM prices jumped >60% between 2024 and 2025. Samsung and SK Hynix are planning ~20% price hikes for 2026 as demand for H200s and ASICs remains insatiable.

Collateral damage

The shift of DRAM wafer capacity to HBM is causing shortages in DDR5 for servers. Server memory prices could double by 2026. Samsung raised 32GB DDR5 prices from $149 to $239 in just two months.

The Supply Crunch

Why you can’t buy enough GPUs — and HBM is a big reason why

The HBM Supply Chain

Six steps, each a potential bottleneck

1. DRAM Wafer FabricationSK Hynix / Samsung / Micron
2. TSV Processing & Die Stackingin-house (MR-MUF / TC-NCF)
3. NVIDIA Qualification TestingSamsung failed here repeatedly
4. Silicon Interposer FabricationTSMC
5. CoWoS Packaging (2.5D)TSMC + Amkor + SPIL
6. Final GPU Module Assemblyshipped to hyperscalers

DRAM supplier inventories fell from 13–17 weeks (late 2024) to 2–4 weeks (October 2025). The entire chain is stretched thin.

The Double Bottleneck

HBM supply AND CoWoS packaging are both constraints

Bottleneck 1: HBM supply

  • HBM3e sold out through 2026
  • Only 3 manufacturers on Earth
  • Shifting wafer capacity to HBM starves DDR5 supply
  • SK Hynix signed supply deal with OpenAI for Stargate — expected to more than double total industry HBM demand

Bottleneck 2: CoWoS packaging

  • TSMC CoWoS capacity: ~75K wafers/month (2025)
  • Demand: ~670K wafers total for 2025, growing to 1 million in 2026
  • NVIDIA has secured >60% of all CoWoS capacity
  • Google reportedly cut 2026 TPU target from 4M to 3M units due to CoWoS limits

Memory shortage expected to persist through at least late 2027 (per SK Hynix guidance).

Memory Bandwidth by GPU Generation

The bandwidth race drives AI chip roadmaps

A100
2.0 TB/s
H100
3.35 TB/s
H200
4.8 TB/s
B200
8.0 TB/s
Vera Rubin
22 TB/s (HBM4)

From A100 to Vera Rubin: 11× bandwidth improvement in four GPU generations. Compute grew ~8× in the same period. The industry is clearly prioritizing bandwidth over raw FLOPS — because the memory wall is the binding constraint.

Investment Angle

HBM is reshaping the entire memory industry

NVIDIA’s HBM Supply Strategy

  • NVIDIA provides significant advance payments to SK Hynix and Micron to secure supply years ahead
  • NVIDIA has locked up >60% of all CoWoS capacity for 2025–2026
  • Controls the entire supply chain through purchasing power
  • Blackwell GPUs are backlogged for a year or more

The power dynamic

NVIDIA’s stringent qualification tests give it enormous leverage. Failing qualification (as Samsung did with HBM3e) means losing billions in revenue.

HBM4 allocation (2026 est.)

SK Hynix
~70%
Samsung
~28%
Micron
~18%

Note: Samsung is racing to deliver HBM4 samples early to regain share lost during the HBM3e qualification failures.

The Memory Industry Transformation

Before AI (the commodity cycle)

  • DRAM was a commodity: oversupply → price crash → capex cuts → undersupply → repeat
  • Samsung, SK Hynix, Micron trapped in boom-bust cycles
  • Margins razor-thin in downturns
  • Low differentiation — memory is memory

After AI (structural demand)

  • HBM is not a commodity — advanced packaging, qualification moats, supply constraints
  • HBM commands 5× pricing premium over DDR5
  • SK Hynix operating margins hit record highs
  • Demand is structural, not cyclical — every AI chip needs more HBM
  • HBM revenue doubling year-over-year

The question for investors: Is HBM demand genuinely structural (like NAND in smartphones) or a cyclical AI capex boom that will revert? The supply sold-out-through-2027 signal suggests structural.

The Geopolitical Dimension

  • South Korea’s SK Hynix and Samsung hold >80% of the HBM market
  • This gives South Korea outsized strategic importance in the AI supply chain
  • HBM manufacturing cannot be easily replicated — decades of process knowledge
  • China has no HBM manufacturing capability and export controls prevent acquisition

The supply chain map

  • DRAM dies: South Korea (SK Hynix, Samsung) + USA (Micron)
  • TSV & stacking: South Korea + USA
  • Interposers: Taiwan (TSMC)
  • CoWoS packaging: Taiwan (TSMC)
  • Equipment: Netherlands (ASML), USA (Applied Materials), Japan (TEL)

Key Takeaways

  • Memory bandwidth, not compute, is the bottleneck for LLM inference — GPUs are <1% utilized on compute during token generation
  • HBM solves this by stacking DRAM dies with TSVs for 1024-bit wide buses, delivering 8+ TB/s on modern GPUs
  • Manufacturing is extraordinarily difficult: 19 extra steps, compound yield losses, sub-millimeter precision, extreme thermal management
  • Only 3 companies make HBM: SK Hynix (62%), Micron (21%), Samsung (17%) — a tight oligopoly with years-long qualification cycles
  • Supply is sold out through 2027 — HBM allocation is the real gate on GPU availability, alongside CoWoS packaging
  • HBM4 doubles the bus width to 2048-bit, arriving in 2026 for Vera Rubin and MI400 — the bandwidth race accelerates
  • The memory wall drives everything: GPU roadmaps, chip pricing, hyperscaler capex, and geopolitics all revolve around getting enough bandwidth

989 TFLOP/s of compute.
Starving for bytes.
HBM is the fix.

The memory wall is the most important constraint in AI infrastructure.